BackBack to the home page Help for site
 
 

Shaw has experienced building teams including a steel fabrication division.
Shaw has constructed it’s own workshop and three story office complex.
The workshop construction entailed
a structural steel clad frame and the
office complex construction included
a combination of structural steel and precast tilt up concrete panels.

Shaw has a very versatile and highly skilled metals and welding fabrication division based out at our workshop at Whitemore.

We are involved when required in civil contracts completing all steel fabrication works. Shaw has been the main contractor in numerous projects being the installation of structural steel launders for Temco slag carrier access ramps and for the furnace upgrade, and installation and welding of a steel pipe in the cataract Gorge Cliff grounds.

Bass Link Convertor Station

Bicheno Residence

Longford Water Treatment Plant

Risdon Switchyard

Waddamana Switchyard

Whilst Shaw Contracting Pty. Ltd. makes every attempt to ensure the accuracy and reliability of information published on, served by and accessed via its Internet pages, the information contained therein should not be relied upon as a substitute for formal advice from the original organisation, its employees and agents will not be responsible for any loss, however arising, from the use of, or reliance on this information.
NOTE:
If you have any trouble printing any information in this site, go to the "Help" section.


www.shawcontracting.com.au. 
776 Whitemore Road, Whitemore, Tasmania, Australia, 7303. I. Email: info@shawcontracting.com.au .I .Phone: +61 363 970 222. I. Fax: +61 363 970 225