Shaw has wide experience in the construction of culverts and pipelines including:

• The stock underpass and the majority of the drainage works on the East Tamar outlet – Newnham Creek to Barnard’s Creek.

• A 390m long 2100mm diameter concrete pipeline at the Pateena Road intersection of the Bass Highway constructed under contract R-N/R-114. Shaw also manufactured the 2100mm.diameter class 1.5Z reinforced concrete pipes used in this project utilising vertical cast technique.

• A total of 4.1 kilometres of culverts of various sizes completed as part of our Bass Highway Projects from Penguin to Chasm Creek.

• 800m of trench drains up to 10m in depth were successfully installed on the Bass Highway – Saddle to Zig Zag
Road project to drain potential and
active slips in wet conditions.

Henty Stage 3 Tailings Dam

Poatina Re-Regulation Storage Dam

Yan Yean Reservoir

Whilst Shaw Contracting Pty. Ltd. makes every attempt to ensure the accuracy and reliability of information published on, served by and accessed via its Internet pages, the information contained therein should not be relied upon as a substitute for formal advice from the original organisation, its employees and agents will not be responsible for any loss, however arising, from the use of, or reliance on this information.
NOTE:
If you have any trouble printing any information in this site, go to the "Help" section.


www.shawcontracting.com.au. 
776 Whitemore Road, Whitemore, Tasmania, Australia, 7303. I. Email: info@shawcontracting.com.au .I .Phone: +61 363 970 222. I. Fax: +61 363 970 225