Shaw completed major sewer infrastructure upgrades in Dover, including two new pump stations, emergency storage, dual rising mains and gravity sewer mains. Challenging ground conditions, groundwater inflows and constrained work areas required innovative construction methods and close collaboration with TasWater CDO. Through careful planning and practical problem-solving, the team delivered a reliable infrastructure upgrade while maintaining access for the local community.
TASK



