Shaw replaced 86 metres of pipeline across the Forth River Bridge, including MSCL and PVC connections. With high traffic volumes and sensitive environmental conditions, works were completed using a two-crane lift and rope access techniques to minimise disruption and protect the waterway. The project was delivered safely, on time, and to specification.